Skip to content

CSLB Lic. B #1125188 · Licensed, bonded & insured

Serving Los Angeles & Orange County

Modern gray tile bathroom with floating black vanity and glass shower

Bathroom remodeling in Los Angeles & Orange County

Bathrooms that feel like a fresh start: clean design, solid waterproofing and finish work you'll notice every morning.

  • Free on-site estimate
  • Licensed, bonded & insured · CSLB B #1125188
  • Design help before demo day

5.0

Google reviews

5.0

Thumbtack reviews

Get a free bathroom estimate

On-site

Rather talk? Call (949) 337-5311

What's included

Everything a bathroom remodel needs, handled

Most of what makes a bathroom last is behind the walls. We plan it, permit it and build it right.

01

Design & layout

Layout, tile, vanity and fixtures chosen with you before work starts.

02

Demolition & haul-away

Old finishes removed and the site kept clean while we work.

03

Plumbing & electrical

Updated lines, new fixtures, lighting and outlets to code.

04

Waterproofing

A proper waterproofing system behind every shower and tub.

05

Tile, vanity & glass

Tile or wall systems, vanities, mirrors and frameless glass.

06

Permits & inspection

We pull permits and stay through final inspection.

How it works

From first visit to first shower

A full bathroom usually takes 3–6 weeks on site, once materials are in. Design and permits happen before that.

  1. 01

    Walkthrough & measure

    We see the room, check the plumbing and venting, talk through how you use the space and what bothers you about it now.

  2. 02

    Layout & budget

    We sketch the layout options and give you a price range for each, so you can pick a direction before choosing finishes.

  3. 03

    Choose finishes

    Tile, vanity, fixtures, glass and lighting. We help you narrow choices and check that everything fits together.

  4. 04

    Order & permit

    Materials are ordered and on hand before demo, so the job doesn’t stall. We pull the permit.

  5. 05

    Demo & rough-in

    Old finishes out. Plumbing, drains, wiring and the exhaust fan are moved or upgraded, then inspected.

  6. 06

    Waterproof & tile

    Waterproofing goes on and is tested before any tile is set. Then tile, grout and the shower pan.

  7. 07

    Install & finish

    Vanity, toilet, fixtures, glass, mirrors, lighting, paint and trim.

  8. 08

    Final walkthrough

    Final inspection, a punch list with you, and a clean room ready to use.

Decisions

The choices that shape your bathroom

There's no single right answer. Here's how we help people decide.

Tub, shower or both?

A walk-in shower feels bigger and is easier to get into. Keep at least one tub in the house if you have small kids or plan to sell soon, since many families look for one.

Tile or wall panels?

Tile gives you the most design options. Large-format panels have few or no grout lines and less cleaning. Both last when the waterproofing behind them is done right.

Curbless (zero-entry) shower

A flush floor with no step looks clean and is safer as you age. It needs the floor recessed or sloped, which we plan before demo.

Vanity: floating or furniture-style

Floating vanities make a small room feel larger and are easy to clean under. Furniture-style vanities hold more storage.

Niches & storage

A recessed niche in the shower wall replaces caddies. Medicine cabinets can also be recessed into the wall.

Ventilation & lighting

A quiet exhaust fan sized to the room prevents mold. Layered lighting (ceiling, vanity, shower) makes the room usable morning and night.

What it costs

Three common levels of bathroom remodel

Read the 2026 cost guide →

Refresh

Under $25,000

Same layout, new surfaces. Best when the plumbing is in the right place.

  • New vanity, toilet & fixtures
  • Tile or panel surround
  • Lighting, mirror & paint

Full remodel

$25,000–$45,000+

The most common project: everything taken down to the studs and rebuilt.

  • Walk-in shower or tub-to-shower
  • New waterproofing & drains
  • Plumbing & electrical updates
  • Frameless glass

Layout change or primary suite

$45,000+

Walls or plumbing move, or the room grows. More design, more engineering.

  • Moving the shower, tub or toilet
  • Double vanity or freestanding tub
  • Curbless entry
  • Larger room or new window

Price ranges are typical for Southern California and depend on size, layout changes and finishes. You get a clear written estimate before anything starts.

Behind the walls

What you won't see, but will notice

The finishes are what people see. What keeps a bathroom working for 20 years is underneath them, and it's the part that gets skipped most often.

Waterproofing

Showers fail from the inside. We install a full waterproof membrane behind the tile and flood-test the pan before tiling.

Slope & drains

The floor slopes to the drain so water never sits. Linear drains allow large tiles and curbless entries.

Valves & supply lines

Old valves and galvanized pipes get replaced while the wall is open, when it costs the least.

GFCI & venting

Outlets near water are GFCI-protected and the fan vents outside, not into the attic, as code requires.

Projects

Bathroom projects

See all projects →

Reviews

Your neighbors trust us

5.0
Google reviews
Read reviews on Google →
My kitchen is so much more functional, and the bathroom feels like a spa. They explained everything so I knew what to expect. No stress at all.
Mark H. · Google
The estimate for our kitchen and bath remodel was detailed and competitive, and their attention to detail won us over. They kept everything clean and delivered exactly what we envisioned.
Laser · Google
Such a good experience. The team was super easy to work with, they actually listened to what we wanted and made great suggestions along the way. They finished on time.
Tao Jung · Google

Questions

Bathroom remodel FAQ

How much does a bathroom remodel cost?

Most full bathroom remodels in Southern California run $25,000–$45,000+, depending on layout changes, plumbing moves, tile and fixtures. You get a written estimate before anything starts.

How long does it take?

A full bathroom usually takes 3–6 weeks on site once materials are in hand. Design, selections and permits come first and often take a few weeks. A refresh with no plumbing changes can be faster.

Can we use the house while you work?

Yes. If it is your only bathroom, we plan the schedule around it and keep the toilet working as long as possible. We seal off the work area to keep dust out of the rest of the home.

Do you pull permits?

Yes. Remodels that touch plumbing, electrical or walls need a permit. We pull it and stay through final inspection.

Will removing the tub hurt resale?

Turning a secondary bathroom tub into a shower rarely hurts. If it is the only tub in the house and you plan to sell soon, keeping one somewhere is usually smart.

Can my shower have no curb?

Often, yes. A curbless shower needs the floor lowered or sloped toward a linear drain. We check your floor framing at the walkthrough.

Tile or a shower wall system?

Both work well, but they feel very different day to day. Our guide on tile vs. shower wall systems explains the trade-offs.

Do you work in my city?

We work across Los Angeles and Orange County, from the San Fernando Valley to Irvine. Enter your ZIP in the form and we will confirm.

Ready when you are. Get your free on-site estimate.

Tell us about the project. We'll call to set up a time to come out.

Or call (949) 337-5311 · [email protected]